Beyond the Pitch: A Higher Standard
Supporting Bromley FC with high-performance washroom solutions designed for growth, durability, and an exceptional matchday experience.
Sitting proudly at the top of the league table and pushing for a well-deserved promotion, Bromley FC are demonstrating excellence both on and off the pitch. At the heart of the club lies the Copperjax Community Stadium at Hayes Lane, a facility that has benefited from over £20 million of investment over the past decade.
As part of this continued development, the club recently undertook a full renovation of its washroom facilities to enhance the match day experience for all visitors, including both home and away supporters.
Bromley FC Washroom Transformation
When Bromley FC set out to upgrade their stadium facilities, they needed a washroom solution that could handle high footfall, deliver on design, and reflect the club’s growing ambition.
Working in partnership with distributor Claygate & Johnston Building Supplies Ltd, Rearo supplied a complete, tailored washroom package for the Copperjax Community Stadium at Hayes Lane, transforming facilities across both home and away stands.
Built for Performance & Experience
This full refurbishment included men’s, women’s, accessible, and individual toilets, all designed with a smart one-way system to improve flow and reduce congestion on busy matchdays. The result is a seamless, user-friendly experience for thousands of fans.
Complete Washroom Solution
Rearo delivered a fully integrated package, including:
- Aspire toilet cubicles
- Vanity units
- Solid surface wash troughs
- Integrated plumbing systems (IPS)
All products were manufactured in Bromley FC’s light and dark grey colour scheme, creating a clean, modern, and on-brand finish throughout.
Why Aspire Cubicles?
Our Aspire cubicles were the ideal choice for this project. Manufactured to bespoke sizes, they maximise space efficiency while ensuring durability in high-traffic environments. Perfect for stadium settings.
The Result
A high-performance washroom environment that not only meets the demands of matchday crowds but also elevates the overall stadium experience. With robust materials, cohesive design, and intelligent layout, Bromley FC now has facilities that match their ambitions.
Materials Used:
ASPIRE CUBICLES
- Light Grey Cubicle Partitions SGL (12mm)
- Light Grey Pilasters SGL (12mm)
- Slate Grey Cubicle Doors SGL (12mm)
IPS
- Slate Grey IPS Access Panels SGL (12mm)
- Light Grey IPS Shadow Gaps SGL (12mm)
IRONMONGERY
Nickel Hardware
VANITY UNITS
- Top: Solid Surface Corian Trough – White
- Panels: SGL (12mm) – Slate Grey
- Shadow Gap:SGL (12mm) – Light Grey